North Indiana Avenue Sidewalk Project, Vista, CA
The Work generally consists of: stormwater pollution prevention and erosion control, demolition and removal/disposal, traffic control and construction staging, clearing and grubbing, site grading and subgrade preparation, aggregate base, PCC curb & gutter, PCC and AC driveway, PCC sidewalk, signing and striping, private property removals and returns, and other related work. The project improvements are shown on the plans D-4746, LD26-041 included in the bid package. The Work to be constructed is located on the East side of North Indiana Avenue from East Orange Street (at The Circle) to E Washington Street, along the frontage of 302 to 332 North Indiana Avenue in the City of Vista, California.