Browse all Clackamas County, OR
Oatfield Rd, Jennings Ave Signal Rebuild Safety Work Project, Milwaukie, OR
Mt Scott and Damascus Area Chip Seal Package, Oregon City, OR
Project Description: This contract involves resurfacing approximately 6.14 miles of roadway through chip seal application, including placement of approximately 107,784 square yards of chip seal with county-furnished aggregate, removal of existing thermoplastic pavement markings, and installation of temporary work zone traffic control measures.
Gladstone Nature Park Restroom & Picnic Shelter Project, Gladstone, OR
Scope of Work: The Project entails public and private improvements to Gladstone Nature Park, including permanent restrooms, picnic shelter, ADA parking and pathway improvements at the park including associated site preparation and demolition, erosion and tree protections, earthwork, utilities, paving, sidewalk, electrical, plumbing, and landscaping.
UV Disinfection Equipment For Wastewater Applications, Oregon City, OR
Description: Supply of the UV system and other services specified. These UV Equipment General Conditions are in addition to, not a supplement to, general conditions of Clackamas Water Environment Services and Clackamas County.
Bakers Ferry Road Paving Project, Oregon City, OR
Scope of Work: This contract includes placing approximately, 8,400 tons of asphalt; 5,400 square yards of cold plane pavement removal; completing pavement repairs of varying depth; guardrail modifications; placing pavement markers and striping; installing, maintaining, and removing temporary work zone traffic control measures; and performing additional incidental work as called for by the specifications and plans.
Planning And Design Services For Neighborhood Park Improvements, Clackamas, OR
Project Description: Planning and Design services for neighborhood park improvements at 13871 SE 122nd Ave, Clackamas 97015.
NCAP Deck Coating, Milwaukie, OR
Scope of Work: Polyaspartic coating application needed for pool deck areas, circulation paths, stairs, and designated wall areas covering approximately 10,390 SF of horizontal surfaces and 1,527 SF of vertical surfaces at North Clackamas Aquatic Park located at 7600 SE Harmony Road, Milwaukie, OR 97222.
Neighborhood Park at Jennings Lodge Campus, Milwaukie, OR
Project Scope: The Work consists of constructing the Park at Jennings Lodge Campus related to grading and excavation; the construction of a playground, pathways, utilities, landscaping, irrigation, street improvements, erosion and sediment controls.
RFQ Forest Hills Elementary Replacement School, Lake Oswego, OR
The new Forest Hills Elementary School will replace an existing school on the same site in the heart of Lake Oswego.The site is approximately six (6) acres in the Forest Hills neighborhood. The scope of work includes a new building andassociated site improvements. The new building will total approximately 71,000 SF, with two-story and single-storycomponents. The footprint of the building is expected to be approximately 45,000 SF.
On-Call Environmental Consultation, Oregon City, OR
Project Description: The environmental consultant is expected to perform the following tasks Consult with County staff to identify specific needs and discuss options for accomplishing those needs. Perform site visits to accomplish tasks including presence/absence of wetlands and wetland delineation, determination of bank-full width, ordinary high water delineation, Stream Function Assessment Method (SFAM) field work, regulatory compliance monitoring & reporting, fish-salvage, analysis & plan development for post-construction stormwater treatment facilities, vegetation survival analysis and corresponding documentation, archaeological and historical studies, river hydraulics and scour and stream stability evaluations. Compile various reports including wetland determination, ordinary high water determination, bank full-width memo, permit exemption memorandums, Joint Permit Applications, Stream Function Assessment Method (SFAM) workbooks, analysis & plan development for postconstruction stormwater treatment facilities, regulatory compliance, fish-salvage and associated permit acquisition & follow-up reporting, archaeological and historical studies, river hydraulics and scour analysis calculations, no-rise floodplain analysis, stream stability, County & City land-use, & other environmental technical reports. Acquire permits from and/or verify permitting exemptions with local, state and federal agencies and act as a liaison on behalf of Clackamas County in regulatory based meetings & discussions. Provide assistance and guidance with respect to cultural resource regulations
Perform Water System Improvements on the Boring Water System District System, Boring, OR
Project Description: Perform Water System Improvements, including extensions or connections, to the Boring Water System District System.
Construction Manager/General Contractor (CM/GC) Services - 2025 Bond Phase 3 Projects, Oregon City, OR
The general scope of the OCSD 2025 Bond Projects include major renovations at Beavercreek Elementary School, Gaffney Lane Elementary School, Redland Elementary School and Pioneer Stadium.
Mulino State Airport Hangar and Waterline Project, Mulino, OR
Scope of Work: The Work, includes 1. Expansion of existing hangar building (8 new hangars) including slab foundation and new hangar. 2. Extend Taxilane east of hangar extension with new pavement section . 3. Extend asphalt pavement from face of hangar to Taxilane west and east of hangar extension. 4. Install new storm drainage conveyance system for hangar extension . 5. Install new storm drainage facility to infiltrate the 2 -year, 24-hour, storm event and detain stormwater events 5-year through 100-year to pre-existing conditions. 6. Relocate existing electrical power to existing hangar for hangar extension and reconnect power to existing hangar. 7. Install Taxilane markings.
Beavercreek ES Asbestos Flooring Removal, Beavercreek, OR
Project Summary: The goal of this project is Beavercreek Elementary School classrooms: 3, 5, 6, 17, 18, 19, 29, 30, 31, 32, 33 and 34: Remove and dispose of approximately 13,711 square feet of tile, carpet and asbestos containing mastic. Work will be accomplished using wet and manual methods, within neg-air containment by Oregon certified asbestos workers and supervision in accordance with regulatory requirements for the safe handling and disposal of Class II friable asbestos products. After removal, grind concrete floor with 25 grit blades to remove mastic without using solvent. Work will be accomplished using wet and manual methods, within neg-air containment by Oregon certified asbestos workers and supervision in accordance with regulatory requirements for the safe handling and disposal of Class II friable asbestos products.
Commercial Landscape Services RFP, Happy Valley, OR
Douglas Loop Trail Lighting Electrical Contractor, Oregon City, OR
Project Description: The intent of this Request for Bid Package is to contract with an Electrical Contractor via a Design-Bid-Build (Lump Sum Bid) delivery model for improvements to the Loop Trail lighting system. This project entails installation of new light poles and fixtures and replacement of existing fixtures around the Douglas Loop Trail at Clackamas Community College in Oregon City, OR. The project entails installation of (58) New 14'-0" Poles, (61) New Luminaire Heads. (7) Dual New Luminaire Heads, (2) New 20'-0" Poles, and Demo of (2) Pole Locations.
Special Testing and Inspection Services, Oregon City, OR
Scope of Work: Code required Special Inspection services and Soils / Geotechnical Field inspections and monitoring services for the OCSD 2025 Bond Projects.
Stone Creek Irrigation Replacement Project, Oregon City, OR
Chemical Supply for Water Environment Services, Oregon City, OR
Scope: Supply of multiple chemicals and their delivery to three (3) separate locations on an as-needed basis for the Clackamas County Water Environment Services (WES).