Scope of Work: The Project consists of furnishing all qualified professional personnel, supervision, construction labor, equipment and specified materials to install one (1) Owner supplied steel power transmission pole. Work includes traffic control, surveying, site clearing, digging/augering pole hole, assembly and erection of one slip joint steel pole.
Post Date: 04/24/2026Bid Date:05/12/2026Trades: High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Project Description: Revised Site Renovations for Centennial School District at Centennial Middle School. The Contractor will provide all labor, equipment, materials, project management and site supervision as required to complete all scope of work described in the project specifications for the site renovations at Centennial Middle School.
Post Date: 04/26/2026Bid Date:05/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Project Description: The environmental consultant is expected to perform the following tasks Consult with County staff to identify specific needs and discuss options for accomplishing those needs. Perform site visits to accomplish tasks including presence/absence of wetlands and wetland delineation, determination of bank-full width, ordinary high water delineation, Stream Function Assessment Method (SFAM) field work, regulatory compliance monitoring & reporting, fish-salvage, analysis & plan development for post-construction stormwater treatment facilities, vegetation survival analysis and corresponding documentation, archaeological and historical studies, river hydraulics and scour and stream stability evaluations. Compile various reports including wetland determination, ordinary high water determination, bank full-width memo, permit exemption memorandums, Joint Permit Applications, Stream Function Assessment Method (SFAM) workbooks, analysis & plan development for postconstruction stormwater treatment facilities, regulatory compliance, fish-salvage and associated permit acquisition & follow-up reporting, archaeological and historical studies, river hydraulics and scour analysis calculations, no-rise floodplain analysis, stream stability, County & City land-use, & other environmental technical reports. Acquire permits from and/or verify permitting exemptions with local, state and federal agencies and act as a liaison on behalf of Clackamas County in regulatory based meetings & discussions. Provide assistance and guidance with respect to cultural resource regulations
Post Date: 04/26/2026Bid Date:05/12/2026Trades: Environmental Consulting & Testing, Water & Air Quality & Ecological Stewardship, Compliance & Services, *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
Project Description: Furnish all labor and equipment necessary to install approximately 2,800 feet of 1-2" HDPE conduit and 1,100 feet of 1-3" HDPE conduit in Florence, Oregon. Work also includes installation of one (1) single-phase switch-stand, four (4) handholes, eight (8) ground sleeves and three (3) hill holders in accordance with District Specifications.
Post Date: 04/20/2026Bid Date:05/13/2026Trades: High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Project Description: South Medford High School Outdoor Eating Space.
Post Date: 04/23/2026Bid Date:05/13/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Scope of Work: 1.Construct pedestrian ramps. 2. Construct private road approach. 3. Install traffic signal system. 4. Perform additional and incidental Work as called for by the Specifications and Plans.
Post Date: 04/27/2026Bid Date:05/13/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS)
Furnish all labor and equipment necessary to install approximately 2,500 feet of 1-2" HDPE conduit in Mapleton, Oregon. Work also includes installation of one (1) single-phase switch stand, five (5) hand holes, one (1) ground sleeve, and one (1) hand holder. Certain locations will require coordination with District crews for installation of sweeps into energized equipment. All materials will be furnished by the District.
Post Date: 04/28/2026Bid Date:05/13/2026Trades: Municipal & Underground Utility Contractor: Subsurface Mapping, Locating Services: Pipes, Power, Telecom, Potholing, Daylight, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Scope of Work: This project will result in the installation and commissioning of a Fire Detection System (FDS) in the Trail Bridge Powerhouse, approximately 71 miles east of Eugene on the upper McKenzie River; accessible by State Highway 126 East.
Post Date: 04/28/2026Bid Date:05/13/2026Trades: Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV)
Project Description: The project includes interior repairs in two (2) existing buildings due to flood damage. Work consists of replacement and repair-in-place of damaged floor finishes, wall finishes, doors, casework, restrooms partitions and fixtures. Initial demo has been performed requiring scope of remaining demo to be reviewed by potential bidders during the mandatory site walk.
Post Date: 05/04/2026Bid Date:05/13/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Description: This project consists of a comprehensive roofing renewal of the existing, in-service low-slope roofing assembly with an adhered system comprised of: 1. Adhered air and vapor barrier membrane. 2. Polyisocyanurate insulation for conformance with current Oregon Energy Efficiency Specialty Code (OEESC). 3. Rigid coverboard and single-ply thermoplastic membrane. 4. Slope to drain.
Project Description: Contractors shall furnish any or all of the following chemicals: Sodium Hypochlorite (Low Sodium) 12% Liquid, Liquid Aluminum Sulfate, Dense Soda Ash Powder (bulk and in bags), Sodium Fluorosilicate (bags), and Liquid Sodium Bisulfite.
Post Date: 04/22/2026Bid Date:05/14/2026Trades: Suppliers: Supplies/Rental/Delivery of Construction Related, Construction Dependent or Construction Equipment
Project Description: This Project is for the construction of a public parking lot located at the Southwest corner of Newmark Avenue & South Wall Street.
Post Date: 04/23/2026Bid Date:05/14/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The Consultant shall provide all personnel, equipment, materials, and professional services necessary to complete the design and preparation of construction documents for the Park Improvements Project. Services shall include project management, engineering & landscape architectural design, permitting coordination, preparation of bid documents, and construction support services.
Post Date: 04/26/2026Bid Date:05/14/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Scope of Work: Construct transmission and distribution water mains, storm drains, sanitary sewers and replace distribution water mains on West 23rd Avenue from Lincoln Street to Amazon Parkway.
Post Date: 04/27/2026Bid Date:05/14/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
The Project consists of sequenced interior remodeling and general building improvements to an existing 83,000 square foot three-story office building. The work includes sequenced improvements and modification on all three floors of the facility with approximately 27,000 square feet per floor. The Project will include demolition, structural, architectural, mechanical, plumbing, and electrical work to provide office, conference, washroom, locker room, and utility spaces. The Work Site is located at Central Building Upgrades Project No. 7316, 15195 NW Greenbrier Parkway, Beaverton , Oregon 97006
Post Date: 05/04/2026Bid Date:05/14/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Scope of Work: The project consists of seismic strengthening in the Evans Valley Fire Station, located at 8677 East Evans Creek Road, Rogue River, Oregon 97537.
Post Date: 04/16/2026Bid Date:05/19/2026Trades: *Construction Management; General Contractor CM/CMGC/CMaC: Owner's Representative Services NIGP 925-44, Seismic Retrofit: Modification of Existing Structures, Earthquake Brace + Bolt, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Project Description: The work consists of removal & replacement of existing Portland Cement concrete (PCC) sidewalks, concrete infill of existing median islands, a limited number of intersection concrete curb ramps, related asphalt concrete patching, saw-cutting, on-call arborist and tree-related work if requested by the City. For more information, contact Jeremy Rhoades, Transportation Maintenance Supervisor (541) 766-6916.
Post Date: 04/22/2026Bid Date:05/19/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
Project Description: The Project consists of the design and remodel of approximately 29,804 square foot of an existing 61,852 square foot building to create a National Guard FMS that supports administrative, logistical requirements and vehicle maintenance requirements for the ORARNG. The completed Project shall be designed to meet the vehicle maintenance.
Post Date: 04/27/2026Bid Date:05/19/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors