2026 Slurry and Crack Seal, Eugene, OR
The Scope of Work includes: Crack Sealing Slurry Sealing Temporary traffic control.
Need an account?
Remembered your password?
Already have an account?
The Scope of Work includes: Crack Sealing Slurry Sealing Temporary traffic control.
Scope of Work: 2" inlay paving along US26 from MP0.47 (under the truss sign bridge near the US101 intersection) to MP5.85 (Lindsey Creek Bridge). No work zone on BR21188 Volmer Creek at MP 2.24, BR21189 Johnson Creek at MP 3.26, or BR19666 Mail Creek at MP 3.99. Stop milling at bridge or approach slab joints. No separate or additional payment will be made for sawing, cleaning, and filling joints at bridge decks or approach slabs. Paint and rumbles to match existing layout (and color for paint) pre-construction. Width limits are outside of fog line to outside of fog line
Scope of Work: Remove approximately 68 of existing Type 2 fence and furnish and install new Type 2 fence located adjacent to NB Interstate 5 (I-5) near MP 151.4 in Douglas County, OR.
Scope of Services: Environmental Site and Subsurface Investigation Services, Preliminary Site Evaluation, Residential and Commercial Underground Storage Tanks (UST) and Aboveground Storage Tanks (AST), Hazardous Materials Survey and Abatement, Industrial Hygiene.
Project Description: interior and exterior window washing and related services at multiple City facilities located throughout the City using a predetermined schedule. It is the Citys intent to award a five (5) year Contract.
Project Description: City may require general architectural services from a consultant for day-to-day issues, including, without limitation, the following: (a) attend council meetings; (b) coordinate and work with City staff; (c) develop architectural design and specifications for city projects, review plans and specifications for City projects; (d) troubleshoot City facilities and make recommendations for improvements; (e) provide planning for City facilities; (f) respond to all manner of general architectural requests including Landscape Architecture; and (e) provide back up to the Public Works Operations Manager when needed. City may contract with a selected consultant to undertake specific projects for City that have a defined scope of work, are relatively larger in scale, and/or for any other reason City desires to assign the work on a task-basis to a consultant.
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. This is a non-personal services contract to provide road maintenance to the Gold Beach Ranger District (GBRD) and Powers Ranger Districts (PRD) of the Rogue River Siskiyou National Forest (RRSNF). Pop 06/04/2026 to 05/01/2027.
Project Description: Provide architectural and related design, engineering & construction services for the replacement of the historic vehicle building located at the Fort Dalles Museum. This project will be delivered using the Design-Build alternative contracting method.
Scope of Work: The Work to be done under this contract, NB along Interstate 5 at MP 124.54 on the multiuse path underneath Structure No. BR07404A, in Douglas County, OR consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the contract plans and specifications: Provide temporary work zone traffic control. Complete repairs to the multiuse path underneath Structure No. BR07404A. Perform additional and incidental work as called for by the contract plans and specifications and as directed.
Scope: Supply of multiple chemicals and their delivery to three (3) separate locations on an as-needed basis for the Clackamas County Water Environment Services (WES).
Indian Small Business Economic Enterprise (ISBEE) Set-Aside, 561730 - Landscaping Services. The scope of work includes complete grounds maintenance services for the Western Oregon Service Unit campus, including routine grounds maintenance, mowing, edging, weed and leaf removal, retention pond maintenance, trash and debris policing, sidewalk and stairway cleaning, vegetation trimming, annual pruning, approved chemical applications, debris disposal, and snow and ice removal as needed. The anticipated period of performance includes one 12-month base period and four 12-month option periods.
Project Description: The work includes replacement of the existing Thermoplastic Polyolefin (TPO) roofing system of the North and South sections of the digester building.
Project Description: The proposed work consists of ADA improvements, pavement improvements, and associated work in the City of Roseburg. ADA improvements will be completed on SE Stephens Street from Oakland-Shady Highway to SE Brockway Avenue. A total of 18 curb ramps will be reconstructed at 6 corners.
Scope of Work: Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the project, including: Removal and lawful disposal of existing membrane roofing system Inspection of roof decking and structural components Repair and/or replacement of damaged substrate (if identified) Installation of new commercial-grade membrane roofing system (TPO, EPDM, or equivalent) Installation of insulation meeting current energy code requirements Flashing, edge metal, and drainage improvements Sealing of all penetrations and rooftop equipment interfaces Site cleanup and debris removal Final inspection and warranty documentation