ID 560004

Archived

2019 CMOM Package 3 (Urgent) Project San Antonio, TX

Bexar County

Owner Reference: CO-00377-FG/19-4542

Bid Date: 11/09/2020 at 10:00AM

Pre-Bid: 10/19/2020
https://saws.webex.com Meeting number (access code): 146 391 5568 Meeting password: XJaJkpXc685 Audio Connection: (210) 233-2090

Estimate: $2,664,160

Sealed bids are requested by the San Antonio Water System for the construction of approximately 2,627 LF of 8-inch through 18-inch existing sanitary sewer pipes by open cut construction and approximately 2,299 LF of 8-inch through 12-inch existing sanitary sewer pipes by pipe-bursting rehabilitation for the 2019 CMOM Package 3 (Urgent) Project. Bonds required. Prevailing wages. Q&A due by 10/26/20 at 10AM.SMWVB goals.

San Antonio Water System (SAWS), Contracting Office, TX

Florinda Gonzales
 (210) 233-3914
 (210) 233-4290
 Login or create an account To view email

Published 10/10/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.