ID 582918
Archived
Santa Clara County
Owner Reference: 2021-105
Bid Date: 05/04/2021 at 02:00pm
Estimate: $2,000,000
The work generally consists of monument preservation, asphalt dig out repairs, placement of paving fabric, asphalt overlay, adjustment of utility covers, replacing traffic striping and pavement markers, replacement of traffic signal loop detectors and other miscellaneous work as outlined in the project specifications. The Project is located at various streets throughout the City. The Project must be fully completed within 50 calendar days. Bonds required. Prevailing wages apply.
City Of Cupertino
Jo Anne Johnson
(408) 777-3354
(408) 777-3333
Login or create an account To view email
Published 04/19/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.