ID 603509
Archived
Orange County
Owner Reference: FR2-0018
Bid Date: 11/16/2021 at 11:00AM
Pre-Bid: 10/14/2021
Via Virtual. https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NTRkNDQyNTQtY2E3ZC00OGIwLTk0NjItMGQwNDU5NTNkZGQ4%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25227dc58bd8-971e-44ae-934b-e60eafc73549%2522%252c%2522Oid%2522%253a%252264262908-8df2-4b94-88db-5702bd4a4961%2522%252c%2522IsBroadcastMeeting%2522%253atrue%257d%26btype%3Da%26role%3Da%26anon%3Dtrue&type=meetup-join&deeplinkId=110259e6-20b6-444b-a515-344d4606a1b0&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true
Estimate: $4,836,000
Project is located at Plant No. 2 at 22212 Brookhurst Street, Huntington Beach, CA 92646 and consists of the replacement of all mechanical “chain and flight” collection system components within six (6) clarifiers at the Secondary Clarifiers at Plant No. 2. The configuration of the clarifiers is rectangular and there are three (3) sets of longitudinal collectors and one (1) cross collector in each clarifier. Work includes some concrete repair and installation of torque limiter mechanisms and proximity sensors. Project duration is 560 calendar days.
Bonds required. Prevailing wages.County of Orange Sanitation District (OCSD) or (OCSAN) CA
Brandon Garcia
(714) 962-2411
Login or create an account To view email
Published 10/07/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.