ID 639258

Archived

Bid date change - Airport Tree Clearing Services, Charlotte, NC

Mecklenburg County

Owner Reference: ITB AVIA 23-10

Bid Date: 10/06/2022 at 02:00pm

Pre-Bid: 09/08/2022
Attendance at the Pre-Bid Conference is not mandatory but is strongly encouraged. Virtual WebEx - https://charlotte.webex.com/charlotte/j.php?MTID=m8be8bcb11dbf64af740996d545586b39

Trades: Tree Service Contractor: Tree Trimming/Pruning, Stump & Tree Removal/Rooting/Grinding, Landscaping Contractor: Grounds Maintenance, Soil Prep, Planting, Clearing, Grubbing, Fertilizing, Mowing,Trimming, Rooting, Mul

Airport Tree Clearing Project involves tree clearing within specific areas outside of the limits of the air operations area (non-secure side). Scope of work includes general erosion and sedimentation control measures including sediment traps, skimmer basins, sediment basins, and silt fence per NCDEQ standards. Clearing and grubbing is not required; only cutting and removal of trees is specified as part of the project scope. A total of approximately 200 acres is anticipated for tree clearing. SCOPE OF WORK: The CLT Airport Tree Clearing Project involves tree clearing within specific areas outside of the limits of the air operations area (non-secure side). Scope of work includes general erosion and sedimentation control measures including sediment traps, skimmer basins, sediment basins, and silt fence per NCDEQ standards. Clearing and grubbing is not required; only cutting and removal of trees is specified as part of the project scope. A total of approximately 200 acres is anticipated for tree clearing.

City of Charlotte NC

Gary Peeples (via email)
 (704) 336-3651
 Login or create an account To view email

Published 08/31/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.