ID 641622

Archived

Bridge Preventative Maintenance, FM0571, Eastland Co., TX

Eastland County

Owner Reference: 6409-19-001

Bid Date: 10/06/2022 at 01:00pm

Estimate: $697,621.25

Trades: Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, General Engineering Contractor GEC

This is a solicitation for contractors interested in entering into a State Let Maintenance Contract consisting of performing bridge preventative maintenance on FM0571 and various Districtwide in the Brownwood DOT, encompassing multiple counties. Critical Path Method (CPM) scheduling will be required to be submitted and maintained monthly by the Contractor unless otherwise directed by the Engineer. Time for Completion: 136 working days. Bonds required. Prevailing wages.

Texas Department of Transportation DOT ML Austin HQ, Austin TX

Chris Graf, P.E.
 (325) 643-0441

Published 09/21/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.