ID 541377

Archived

Butner Rd. at Stonewall Tell Rd. Round About-T242CST Project, Atlanta GA

Fulton County

Owner Reference: ITB20008

Bid Date: 06/04/2020 at 02:00pm

The construction of this project is federally funded and shall comply with all federal requirements. The proposed project includes realignment of the existing all-way stop controlled intersection into two three-legged roundabouts located in the southwestern and northeastern corners of the existing intersection connected by a median. The roundabouts will have two inscribed circles of 110 feet with splitter islands on all of the approaches. Access will be provided to the existing shopping center via the southernmost roundabout. The Project consists of the following major elements: installation of curb and gutter, drainage structures and pipes, concrete sidewalks (5 to 12 feet), signing and marking, landscaping and all associated Americans with Disabilities Act (ADA) improvements including handicap ramps and driveway upgrades. As a result of the construction, miscellaneous water line adjustments will be required to meters, valves and fire hydrants. All other required utility relocations will be handled directly by the utility owner. A bid bond is required for this project. A Bid Bond in an amount equal to five percent (5%) of the bid amount must accompany each Bid. The Bid Bond must be submitted with the Bid. This project encouraged MBE/WBE participation.

City of South Fulton

Drexal Paulk
 (470) 809-7731
 Login or create an account To view email

Published 06/01/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.