ID 642387

Archived

Campo Hills Well 3 Cleaning & Installation, Campo, CA

San Diego County

Owner Reference: 12014

Bid Date: 10/28/2022 at 05:00pm

Trades: C57 - Water Well Construction: Drilling, Installation, Improvements & Maintenance - General Engineering Contractor

The County of San Diego, Department of Public Works - Water & Wastewater Facilities, has a requirement for Campo Hills Well 3 cleaning and pump installation in accordance with the terms & conditions contained in the attached. Campo Hills Water System Well 3 is located approximately at 3215 White Sage Point, Campo, CA, which is 50 miles east of the City of San Diego. The existing well is approximately 80 feet in total depth with an internal diameter of 10 inches. Well 3 is one of two wells supplying the Campo Hills Water System. The water system conveys raw groundwater from the wells to the Campo Hills water treatment plant and further on through the Campo Hills water distribution system. Refer to Exhibit 1 for a location map of the well and treatment plant. Questions are due and must be in writing prior to 5:00 PM on Oct 21st. Bonds required. Prevailing wages.

County of San Diego CA

Rene LeLevier
 (858) 505-6545
 Login or create an account To view email

Published 09/29/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.