ID 641786

Archived

Charlotte Fire Station #36 HVAC Renovation, Charlotte NC

Mecklenburg County

Owner Reference: BM2022-1176

Bid Date: 10/18/2022 at 02:00pm

Pre-Bid: 10/04/2022
CFD FIRE STATION # 36 2325 W Mallard Creek Church Rd, Charlotte, NC 28262

Trades: HVAC Contractor: Heating Ventilating Air Conditioning and Controls, Air Chillers

The mechanical demolition work consists of removing the five (5) existing split system gas furnaces and outdoor air-conditioning condensers, and the one (1) inline exhaust fan above the men’s locker room. All existing ceiling diffusers and grilles shall be demolished and replaced inplace in new work. Existing split system controls, bipolar ionization devices, furnace terminations, and ductwork are to be kept and reused in the new work. The new mechanical work consists of installing five (5) new split system heat pumps and gas furnaces in the same place as demolished split systems, and reusing controls, bipolar ionization, existing furnace intakes/vents and reconnecting to existing gas. Outside air dampers will be adjusted to reduce outside air flow. Existing controls will need to be reworked to account for the change from cooling-only coils to heat-pump coils. A new, smaller, inline fan will be installed in place of demolished fan above men’s locker. New diffusers and grilles will be installed in-place of demolished diffusers and grilles. Bonds required. Prevailing wages.

City of Charlotte NC

David Larson (Enginrering Contract Specialist)
 (704) 432-6092
 Login or create an account To view email

Published 09/23/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.