Concrete Foundation for Substation Bus Split, St. Charles, IL.

Kane County

Owner Reference: 6064

Bid Date: 01/29/2021 at 09:00am

Contractor will construct eight (8) new 2'x12' concrete Pier foundations for structure supports and a total of seven (7) circuit breaker pads. ONLY hand excavation will be permitted in the substation. Contractor shall remove a minimum of 12 inches of material including the aggregate base course and place porous granular material underneath the "Pier" foundations, and compact it to ASTM Standard requirement. Contractor shall hand dig piers inside the energized substation area. Work to begin fall 2021. Prevailing wages. St. Charles, IL.

City of St. Charles

Joan Schouten
 (630) 762-6936
 Login or create an account To view email

Published 01/12/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.