ID 555014

Archived

Construction Of A 20"X10" Diameter Well (no. 5), East Quogue NY

Suffolk County

Owner Reference: 7711

Bid Date: 09/28/2020 at 11:00am

Pre-Bid: 09/17/2020
The site is located at 80 Spinney Road, East Quogue, New York

The proposed gravel-packed well, approximately five hundred forty (540) feet deep, is to be drilled on the well field site. For complete details with respect to the location of the proposed well and general area, reference is made to Drawing No. 04356C01 included herewith. Preliminary test boring work has been completed at this site and the description of materials encountered is being given hereinafter, including geological data. In addition, geophysical logs were run in the test hole and results of these tests, including samples obtained, are available for study by prospective Bidders. The static water level in the existing wells on this site is approximately 45 feet below grade. The Authority has petitioned the Department of Environmental Conservation of the State of New York relating to the construction of the proposed permanent well and a favorable decision is anticipated (Application ID #1-4736-07861/00003). The notice to proceed will only be given to the contractor if and or when the permit is received. In the event it becomes necessary to construct the proposed well at another suitable location, where land and approval of various State, County, Town or Village Departments having jurisdiction thereof may be otherwise obtained, the Owner reserves the right to construct the well as proposed herein at such other suitable site or cancel the entire project. The Authority has water supply facilities at present near the premises where the well is to be drilled. Drilling water as required will be limited to that which can be obtained through a 2"-diameter pipe and only at such times as an adequate supply is available. A double-check valve backflow preventer shall be installed on the supply piping whenever the Authority’s supply is being used by the Contractor. The Contractor must notify SCWA Engineer and call the Bay Shore Control Center (631- 665-2653) prior to hooking up to hydrant. The Contractor will also be required to construct a plywood noise barrier at his expense, if deemed necessary by the Engineer, to buffer construction noise, to provide a visual barrier to on site activities, and to eliminate neighbors' complaints, as outlined in Section 1.3. The Contractor will be required to rotate a pilot hole no greater than 18 inches in diameter to the final drilled depth of five hundred fifty (550) feet as determined by the Engineer. Bonds required, please refer to documents for further details about wage rates. This project encouraged M/WBE participation.

Suffolk County Water Authority

Marlon Torres
 (631) 563-0334
 (631) 589-5268
 Login or create an account To view email

Published 09/07/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.