ID 580279

Archived

Construction of Hernando Beach Fire Station No6 Hernando Co, FL

Hernando County

Owner Reference: 21-CG0051/DK

Bid Date: 05/12/2021 at 03:00pm

Pre-Bid: 03/30/2021
Hernando Beach Fire Station, 3451 Shoal Line Blvd., Hernando Beach, FL 34607

This project consists of complete demolition of existing pre-engineered metal building. Construct new 2-story crew quarters for a fire station. Ground floor area includes eight hundred and forty (840) square feet of enclosed area with breakaway construction due to coastal conditions, along with one thousand five hundred and thirty-six (1,536) square feet of exterior covered area. Second Floor at two thousand three hundred and seventy-six (2,376) square feet total, including bunk rooms, dayroom, kitchen, and offices. New Building to be constructed over existing building's footprint. Other Work indicated in the Contract Documents that includes Site Work as new entry drive with loop drive and aprons at the existing Apparatus Building. Covered breezeway between crew quarters and Apparatus Building, porch, and covered exit stairway from the second floor. Bid Bond 5 %, Performance Bond 100 %, Payment Bond 100 %

County of Hernando

Diane Kafrissen
 (352) 754-4020
 Login or create an account To view email

Published 03/29/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.