ID 630020

Archived

Crane Mill Road Guardrail Replacement - 2022-12 (139), Clarkesville, GA

Habersham County

Owner Reference: 2022-12

Bid Date: 06/24/2022 at 02:00pm

Pre-Bid: 06/06/2022
Habersham County Commissioners Conference Meeting Room, Room No. 211 located on the main level at 130 Jacob’s Way, Clarkesville, GA 30523

Trades: Fencing Contractor: Heavy Fences, Guardrails, Gates, Ornamental Iron - General Engineering Contractor, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47, Erosion Control - General Engineering Contractor, Excavation & Grading - General Engineering Contractor, General Engineering Contractor GEC

Project consists of: demolition of existing guardrails. Cutting and replacing of concrete curb and/or spillways as needed. Installing posts and guardrail to four corners of existing crane mill bridge and connecting new guardrail to bridge. Installation and maintenance of erosion control measures and revised grading at guardrail and bridge. Project completion date: September 17, 2022. All work on this project shall be in accordance with Plans, if any, Special provisions and the 2013 edition of the Georgia Department of Transportation Standard Specifications and current edition of any applicable Supplemental Specifications. Questions via email to Owner by 6/17/2022, 2:00pm. Bonds required.

County of Habersham GA

Purchasing - Finance Department
 706-839-0200
 Login or create an account To view email

Published 05/25/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.