ID 568611

Archived

Demolition & Abatement of the Old Police Station, Stamford, CT

Fairfield County

Owner Reference: S-6784

Bid Date: 01/26/2021 at 11:00am

Pre-Bid: 01/05/2021
Meet in front of the old Police Station, located at 805 Bedford Street, Stamford, CT 06905. All in attendance must wear a face mask.

The work under this section consists of furnishing all labor, equipment, and materials necessary for the demolition, removal, and disposal of all existing slabs, bollards, fences, curb stops, footings, foundations, structures, canopies, curbing, sidewalks, demolition of underground tanks and piping, filling of underground piping, removal of demolished materials from site and removal of light poles, light pole foundations, piping, wiring, conduit as indicated on Contract Drawings, etc., along with the removal/ capping of utilities, payment of utility company fees, and backfilling voids. Demolition and removal of curbs and gutters, drainage structures, utilities, signage or landscaping. Disconnecting and capping or removal of identified utilities. All footings and basement walls shall be removed completely. Also included is securing the necessary permits, payment of disposal fees, preparation of manifest forms, grading side slopes of excavation or demolition voids, backfilling of demolition voids, septic system areas, utility trenches etc., compacting backfilled areas, disposing of surplus material, disposal of demolition material, installation of erosion controls such as hay bales and siltation fences as required or ordered by the Engineer and cleaning up the site. This work shall not include clearing, grubbing or pavement removal except where the Contract Drawings so indicate, be ordered by the Engineer, or required. Perform work in accordance with OSHA - CFR29, Part 1926 Subpart T and all State and local ordinances. The work shall include the removal from the site of all rubbish, debris, concrete, block, wood, tanks and steel and other materials resulting from these demolition operations. The work shall further include: filling voids in subgrade created as a result of removals or demolition, removal of hazardous building material abatement, removal of underground piping and appurtenances as indicated, removal or transformers and meters where indicated coordination with electric company, removal and disposal of any sidewalks, fences, stairs, walls, debris and rubbish in an approved off site Landfill, removal and disposal of staircases and cast-in-place retaining walls as indicated, remove and dispose chain link or wooden fences, posts, foundations, and gates, removal and disposal of guide rails, posts, and foundations, removal and disposal of Gas services (If any), capping of existing Gas Services (If any), removal of existing water mains and services and hydrant laterals and hydrants as indicated, capping of existing Water Services, protection of work or improvements to remain, and hazardous material compliance. Bonds and prevailing wages.

City of Stamford CT

Jeff Pardo
 (203) 977-5227
 Login or create an account To view email

Published 12/26/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.