ID 640674

Archived

Demolition of Mount Calvary Church Project, Lawrenceville, GA

Gwinnett County

Owner Reference: SB007-23

Bid Date: 10/17/2022 at 03:00pm

Pre-Bid: 09/28/2022
145 Neal Blvd., Lawrenceville, GA, 30046

Trades: Building Moving, Wrecking & Demolition Contractor: General Engineering Contractor or General Contractor

Project description: 1. All improvements must be completely demolished and removed from their present site as per the plans. All the building structures as per drawings including: floor slabs, power poles, asphalt/concrete paving, concrete footpaths, driveways, footings, septic tanks, basement/crawlspace walls, retaining walls, debris, junk and trash removal, trees, tree roots & shrubs and if necessary, fencing if any excluding the property fencing as instructed by the Project Engineer. 2. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. 3. Backfill basement and all disturbed areas with good dirt compacted to min 95%. The end result of the demolition areas needs to be that the area has a smooth flat slope and drains well, and sod after demolition is completed. 4. Erosion control shall be installed as per the drawings or where necessary or as directed by the Project Engineer. Including installation of an orange fence (tree save areas) as per the drawings. 5. Basements & crawlspaces if any must be graded, back filled & compacted, and sloped in such a manner that the site does not retain water and is acceptable to the Project Engineer. The Work shall be completed within 45 consecutive calendar days. Questions via email to Owner by 10/3/2022, 3:00pm. Bonds required.

City Of Lawrenceville GA

Steve Murray
 6784076420
 Login or create an account To view email

Published 09/14/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.