ID 577864
Archived
Santa Clara County
Owner Reference: S21019
Bid Date: 05/07/2021 at 05:00PM
Estimate: $5 Mil
Design Build: The largest single public infrastructure project ever constructed in Santa Clara County, the Program will extend BART service six miles from the Berryessa/North San José BART station through downtown San José and terminating in the City of Santa Clara. BART will operate and maintain the BSVII Extension.Transit-oriented development (“TOD”) is planned for each of the future station locations as part of VTA’s Transit-Oriented Development Program. However, while each station location will be built to not preclude future TOD, design and construction of TOD is not part of the BSVII Program. The Program is planned to include, among other things: 28th St/Little Portugal Station, Downtown San José Station, Diridon Station, Newhall Yard & Santa Clara Station,Mid-Tunnel Ventilation/Egress Facilities. The Program is proposed to be divided into four discrete projects and corresponding contracts. These will include Contract Package 1 – Systems (“CP1”), Contract Package 2 - Tunnels and Trackwork (“CP2”), Contract Package 3 - Newhall Yard & Santa Clara Station (“CP3”), and Contract Package 4 – Stations (“CP4”). There will also be separate contracts associated with TOD. This RFIF covers only Contract Package 3 (CP3) – Newhall Yard and Maintenance Facility (NYMF) and Santa Clara Station. Q&A due by 04/02/21 at 5PM.
Santa Clara Valley Transportation Authority
Deloris Hood
408.321.7189
408.955.9729
Published 04/05/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.