ID 640335

Archived

Drainage, Resurface, Add Shoulders, Osage & Maries Counties, MO

Osage County

Owner Reference: 221021-D03 / FAS-S402(1), FAF 42-2(279)

Bid Date: 10/21/2022 at 11:00am

Estimate: $2.5M to $5M

Trades: Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, Cementations Coating Systems, Resurfacing & Seal Coat or Sealings, General Engineering Contractor GEC

Project description: Job J5S3354 Route U, E Osage County. Drainage, resurface, and add shoulders on Route U from Route 50 to Route E and on Route E from Route 89 to Route 63, the total length of improvement being 14.657 miles. (2): Job J5S3473 Route 42, EE Maries County. Resurface on Route 42 from Rte. 63 to Rte. 28 and on Rte. EE from Rte. 28 to end of state maintenance, the total length of improvement being 16.087 miles. Contract Time: 12/1/23. DBE goal 6%. Bonds required. Prevailing wages.

State of Missouri Department of Transportation (MODOT) MO

Design Division - Central Office
 (573) 751-2876
 (573) 522-2281

Published 09/12/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.