ID 670498

Archived

Electric Vehicle Charging Stations, Redmond, WA

King County

Owner Reference: 50022115

Bid Date: 05/25/2023 at 11:00am

Estimate: $260,000 to $318,000

Trades: General Engineering Contractor GEC; Subcontractor Opportunities, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Concrete Contractor: CIP Concrete, Pedestrian Improvements, Sidewalks, Curbs Gutters, Driveways & Handicap ADA Ramps NIGP 913-47, Pavement Marking, Striping, & Reflectors - General Engineering Contractor

Description: The Work to be performed shall include: Construction of ten (10) dual port electric vehicle charging stations at the City of Redmond Parking Garage and one (1) dual port electric vehicle charger at the City of Redmond Maintenance Facility improvements, including but not limited to electrical conduit and equipment installation, PSE trenching, excavation and backfilling upon completion of PSE work, roadway repair and all other work necessary to complete the project. Contact Builders Exchange of Washington at (425)258-1303 should you require further assistance. Bonds required.

City of Redmond WA

John Mork
 (425) 556-2738
 Login or create an account To view email

Published 05/14/2023 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.