ID 638614

Archived

Engineering Design Services for the Goetz Rd Intertie, Canyon Lake, CA

Riverside County

Owner Reference: C2203

Bid Date: 10/11/2022 at 02:00pm

Pre-Bid: 09/07/2022
Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Meeting ID: 287 515 502 808 Passcode: fSe9UL

Trades: A&E: Professional Architecture, Design, Engineering, Consulting, Consultant Services

Elsinore Valley Municipal Water District (EVMWD) is a publicly-owned water and sewer service agency with approximately 46,000 water service and 36,600 sewer service connections, serving a population of approximately 157,000. The project is within EVMWD’s boundaries and is located within the City of Lake Elsinore and/or County of Riverside. Currently, EVMWD’s main two sources of water supply to the Canyon Lake Area are the Canyon Lake Water Treatment Plant and a 33-inch transmission main that crosses the Interstate 15 Freeway, west of Diamond Drive. The Canyon Lake Water Treatment Plant is offline, leaving EVMWD with only one supply source. This project will create an intertie connection with Eastern Municipal Water District and provide EVMWD with system reliability and redundancy within the Canyon Lake area. The Interconnection will have a bidirectional meter installed to enable either water district to supply water in an emergency water situation. EVMWD intends to initiate this project in December 2022, anticipating completion in August 2024. Questions due 10/4/22.

Eastern Municipal Water District (EMWD) CA

Kelia Jones
 951-674-3146
 Login or create an account To view email

Published 08/25/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.