ID 628315
Archived
Stanislaus County
Owner Reference: 2022-200023
Bid Date: 06/01/2022 at 10:00am
Estimate: <$150,000
Trades: A - General Engineering Contractor GEC
Renovations: Stanislaus County Public Works is now accepting bids for the Fire Damage Repair of Carpenter Road & Mitchell Road Bridges over the Tuolumne River project. Estimated Construction cost for this project is less than $ 150,000. The work to be accomplished includes Fire Damage Repair and includes traffic control, structural concrete, joint seal, replace timber blocking with precast concrete blocking. The Contractor shall commence work within 5 calendar days after the date of the Notice to Proceed, and shall complete the work within 25 working days. The date of the Notice to Proceed shall constitute the first working day. Job site activities shall be limited to 10 working days at Carpenter Road Bridge and 15 working days at Mitchell Road Bridge. Bonds required. Prevailing wages.
County of Stanislaus CA
Abigayle Durrer
(209) 525-4185
Login or create an account To view email
Published 05/11/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.