ID 604961

Archived

First and F Street Bridge Replacement Project, Petaluma, CA

Sonoma County

Owner Reference: C16402141

Bid Date: 11/18/2021 at 02:00pm

Trades: General Engineering Contractor GEC

 Demolish old wood bridge structure at intersection of First and F streets in Petaluma and replace with a new pre‐cast bottomless concrete arch culvert, with headwall and cast in place wing walls. Work also includes, but is not limited to, demolition, excavation and backfill, trenching, paving, furnishing and installing storm drain inlet, bridge railing, installing drilled piles into underlying Bay Mud, and installing sheet pile coffer dams and dewatering prior to work within the channel. Contractor is responsible for trench safety, traffic control and compliance with all regulatory permit conditions. The site of the WORK is located: at Thompson Creek, in the City of Petaluma, County of Sonoma, State of California; Latitude 38.232937°, Longitude -122.633704°. It is located at the intersection of First Street and F Street.

Bonds required. Prevailing wages.

City Of Petaluma CA

Ken Eichstaedt
 707.210.2266
 Login or create an account To view email

Published 10/21/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.