ID 631694

Archived

Bifd date change - Foreman Pipeline Access Trail Rehabilitation Project, Boulder Creek, CA

Santa Cruz County

Owner Reference: 2022.06.10

Bid Date: 08/02/2022 at 03:00PM

Pre-Bid: 06/16/2022
Lyon Treatment Plant 365 Madrone Drive, Boulder Creek, California 95006. Site walk follows.

Trades: A - General Engineering Contractor GEC

Erosion control and stabilization of the existing Foreman Pipeline Access Trail using site grading, geogrid and Tecco Mat at 365 Madrone Dr, Boulder Creek, CA 95006. 180- ca;emdar days duration. Bonds required. Prevailing wages.

San Lorenzo Valley Water District (SLVWD) CA

Josh Wolff, P.E.
 (831) 338-2153
 Login or create an account To view email

Published 06/13/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.