ID 540783

Archived

FY 20/21 Citywide Street Resurfacing Project Stanton,CA

Orange County

Bid Date: 06/08/2020 at 02:00pm

The contractor shall furnish all necessary materials, labor, equipment and other incidental and appurtenant work necessary for the proper construction of the project, including removal and disposal of existing AC pavement and concrete pavement surfaces, construction of AC pavement digout with full depth AC pavement replacement repair, 2" grind of existing AC pavement, 2" AC overlay, concrete longitudinl gutters, concrete drainage swales, fire hydrant valve markers,manhole cover adjustments, sewer cleanout adjustments, water meter box adjustments, valve cover box adjustments, traffic control and other items of work. Bonds required. Prevailing wages. DBE goals.

City of Stanton
 (714) 379-9222

Published 05/26/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.