ID 630268

Archived

Glendale Water & Power RFP Local Clean Distributed Energy Resources, Glendale, CA

Los Angeles County

Bid Date: 09/30/2022 at 05:00pm

Pre-Bid: 07/20/2022
RSVP by 7/19/22 at 5pm Intent to submit bid due 7/1/22. Upon notification and rsvp the location of the pre-bid will be emailed.

Trades: Architecture, Engineering, Consulting, C10 - Electrical Contractor - Including Lighting and Possible High Voltage, C46 - Solar Photovoltaic (PV) Contractor, D65 - Weatherization and Energy Conservation, A - General Engineering Contractor GEC, B - General Contractor GC, C61 - Limited or Specialty Contractor

The project must be able to provide a minimum of 5 MW firm capacity by December 31, 2027 and must maintain the guaranteed capacity for the duration of the contract (minimum of ten (10) years). Under this Request for Proposals (“RFP”), the City of Glendale, through its utility department, Glendale Water & Power (“GWP” or “City”) is soliciting Proposals from suitably qualified proposers (“Contractor”) to develop and deliver clean distributed energy and capacity resources (“Services”) within the City of Glendale. The City seeks up to a total of 50 MW of combined capacity from one or more Proposers. Generating capacity that is offered must be reliable and dispatchable and capable of being incorporated into the City’s integrated resource portfolio. This capacity would be in addition to GWP’s existing local energy efficiency, demand response, and solar-storage hybrid programs (additional detail on these programs are provided further on in the RFP). GWP seeks proposals in the following seven categories which shall be connected to GWP’s distribution system or at a customer location(s): 1. Commercial and Industrial Solar Paired with Dispatchable Energy Storage 2. Residential Solar Paired with Dispatchable Energy Storage 3. Dispatchable Energy Storage to Pair with Existing Residential, Commercial and Industrial PV Solar Customers 4. Renewable Distributed Generation (DG) 5. Demand Response 6. Energy Efficiency 7. Any other clean DER solution not encompassed in the above categories Standalone energy storage without a paired clean or renewable generating capacity source will not be considered. GWP will consider up to a total of 50 MW of firm capacity with the mix of resources based upon each resource’s ability to effectively meet the City’s peak demand and reliability needs. 1. The Proposer has successfully completed at least two (2) projects; each comparable in scope and scale to that proposed in the Proposal, within five (5) years before the Proposal Deadline and with a dollar value equal to or in excess of the Proposal submitted for this Project. 2. In addition, for generation and energy storage proposals, the Proposer has successfully completed at least two (2) projects utilizing the proposed technology each with a size not less than 1.0 MW. Bonds required. Prevailing wages.

City of Glendale CA

Mark Young
 (818) 548-2011
 Login or create an account To view email

Published 05/28/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.