Bid date change - I-15/French Valley Parkway Improvements Phase II, Temecula, CA

Riverside County

Owner Reference: PW16-01, Fed #INFRALUL-5459(031)

Bid Date: 12/01/2022 at 10:00am

Estimate: $73,500,000

Trades: A - General Engineering Contractor GEC; Subcontractor Opportunities

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Construct collector/distributor lanes along northbound I-15 from the Winchester Road Interchange to the I-15/I-215 Junction with connectors to I-15 and I-215, within the cities of Temecula and Murrieta in Riverside County, California. The general items of work include: freeway widening, concrete barriers, concrete and asphalt concrete paving, retaining walls, sound walls, drainage, electrical, bridge widening, new bridge construction, signing and striping. DBE goal is 21%. 450 working days duration. Bonds required. Prevailing wages.

City of Temecula CA

Avlin Odviar
 (951) 693-3969
 Login or create an account To view email

Published 09/07/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.