ID 606769
Archived
Shelby County
Owner Reference: 210665
Bid Date: 12/16/2021 at 02:00pm
Trades: General Engineering Contractor GEC
DBE Goal: 7.0% For improving variou sections of roadway per plans & specs by milling 1.75" of existing surface asphalt & replacing it with 1.75" thick 12.5 mm surface course along a 10.16 mile portion of I-75 from SLM 8.67 (SR 29 interchange) to SLM 18.83 (Loramie Creek), including all related items of work. Project includes resurfacing the interchange ramps at the CR 25A, SR 119, and SR 274 interchanges, minor structure maintenance, and placing wet reflective traffic striping. Date set for completion 9/30/2022
Bonds required.State of Ohio Department of Transportation OH (OHDOT)
Dave Slatzer
(614) 466-3598
Published 11/06/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.