Lakeside Tunnel Isolation Project, Springfield FL

Lane County

Owner Reference: UE21-04-17

Bid Date: 06/18/2020 at 02:00pm

Pre-Bid: 06/02/2020
Conference Room 311 Dallman Power Station 3100 Stevenson Drive Springfield, IL 62703-4462

This contract provides for the installation of concrete bulkheads into existing circulating water tunnels into and out of the retired Lakeside Generating Station. Two influent tunnels and three effluent tunnels will be bulkheaded. The concrete bulkheads shall be water tight, allowing zero leakage. Contractor is to supply all labor, materials, construction equipment, and construction management required to execute the work defined in the Contract Documents, which includes, but is not limited to, demolition, site preparation, , and material installation. This project encouraged MBE/WBE participation.

City of Springfield, IL

Bill Antonacci
 (217) 757-8670
 Login or create an account To view email

Published 05/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.