ID 556074
Archived
Cook County
Owner Reference: W912P620B0002
Bid Date: 10/06/2020 at 02:00PM
Pre-Bid: 09/16/2020
Webex
Estimate: $1M - $5M
The Contractor will be required to perform: An additional pump station, adjacent to the existing pump station #2 w ith total capacity of 120 cfs, will be constructed. The design intent is to raise the level of protection by increasing the pumping capacity and perform other improvements. The three submersible axial flow pumps, 40 cfs each, will satisfy the pumping capacity requirement. Each pump will be installed inside the wet well and will be equipped with a Formed Suction Intake (FSI) unit which will ensure smooth laminar type flow towards the pump’s suction side. Bonds required, please refer to documents for further details about wage rates. This project encouraged MBE/WBE participation.
US Army Corps of Engineers IL
Ericka D. Hillard
(312) 846-5378
(312) 886-5475
Login or create an account To view email
Published 09/14/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.