ID 629524

Archived

Lift Pump Replacement, Buffalo, NY

Erie County

Owner Reference: 222149-002

Bid Date: 06/15/2022 at 11:00am

Trades: General Engineering Contractor GEC

Lift Pump Replacement and Rail System: to provide equipment and installation of new equipment for lower lift station. Includes 2 Myers 1/2 HP 230 Volt submersible effluent pumps, 2 guide rail systems; base elbows, couplings, SST top rate brackets 1" guide rail pipe, S.S lifting chain, 1 duplex pump control panel Nema 4x enclosure with alarm light, 4 float switches, 1 SS float bracket, 2 2" PVC ball check valves, 2 2" PVC true union ball valves, confined space equipment, control panel to move to opposite side of pedestal, break existing concrete lids to make room for rail system and provide and install new lid for lift station. MBE goal is 10% and WBE goal is 2%. Prevailing wages.

County of Erie NY

James D. Kucewicz
 (716) 858-6336

Published 05/20/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.