ID 582161
Archived
Lane County
Bid Date: 05/10/2021 at 04:00PM
Estimate: $1,400,000-$1,900,000
The primary purpose of this project is to mechanically stabilize oversteepened slopes that are sloughing or sliding in multiple locations along Mercer Lake Road between Mile Posts 1.95 and 3.70 using soil nailing or other specialized techniques that will reduce the impact of the work on the community, existing underground utility infrastructure, and the environment. Bond Required. Prevailing Wages.
County of Lane, OR
Jeremy Somogye
(541) 682-6900
Login or create an account To view email
Published 04/13/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.