ID 628985

Archived

Miling, Resurfacing & ADA Improvements, Chebanse & Clifton, IL

Iroquois County

Owner Reference: 66K68 / STP-YY9S(980)

Bid Date: 06/17/2022 at 12:00pm

Trades: Highway, Road Improvement or Parking Lot Pavement Repair: May include Resurfacing or Chip Seal - General Engineering Contractor, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47, Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, General Engineering Contractor GEC, Ditches

This project consists of 5.19 miles of 3.75” milling and hot-mix asphalt resurfacing (designed overlay). The project also includes Class D patching and the reconstruction of several ADA sidewalk ramps in Clifton and Chebanse. Additional items of work include grading and shaping ditches, culvert cleaning, and culvert replacement. This project is located at OR 45 from First South Street in Chebanse to Ch 4/Third Avenue in Clifton (Old 45, Main Street, Oak Street) (±4.73 miles) in Iroquois County. Contract Time: 50 working days. DBE goal 11%. Bonds required. Prevailing wages.

State of Illinois Department of Transportation (ILDOT) IL

ILDOT
 (800) 452-4368
 Login or create an account To view email

Published 05/17/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.