ID 636254
Archived
Douglas County
Owner Reference: 5898A
Bid Date: 08/29/2022 at 04:00pm
Estimate: $325,000.00 to $375,000.00
Trades: Electrical Contractor: Low Voltage Electrical or Fiber Optic Cable Contractor (Fiberoptic) & Telecommunications, CO-01 - General Engineering Contractor GEC
The City of Aurora has a fiber line parallel to its Prairies Water Pipeline that runs from its North Campus Wellfields all the way to Binney Water Treatment Plant. This project is for the replacement of the fiber line between the North Campus and Pump Station1 1. Due to the current burial depth of the fiber line (<16” at points) has been damaged in the past due to farming activities which have required full replacement of the damaged sections. The new fiber line will utilize horizontal directional drilling (HDD) between the fiber handholds to achieve a burial depth of 6’. The existing fiber line will be abandoned in place. Questions due 8/17/22. Substantially Complete by 12/16/22 final completion deadline 1/13/23. Bonds required. Prevailing wages.
City Of Aurora CO
Nathan Jones
(303) 739-7343
Login or create an account To view email
Published 08/03/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.