ID 508007
Archived
Yancey County
Owner Reference: 6454945
Bid Date: 08/20/2019 at 02:00pm
Pre-Bid: 08/08/2019
2 Town Square Burnsville, North Carolina
Estimate: $1,000,000.00
THE PROJECT GENERALLY CONSISTS OF: the replacement of the existing water treatment plant sludge storage tank with an 80,000-gallon equalization tank, approximately 1125 LF of 8-inch DIP gravity sewer line, twelve (12) manholes and appurtenances to connect the equalization tank to the existing permitted sewer system. Also included is the replacement of the existing OMC wet pit/dry pit sewage pump station with a new submersible pump station, and reconfiguration of 2.0-MG storage tank discharge piping.
Town of Burnsville
Cyndi Sherwood
(828) 682-2420
(828) 682-7757
Login or create an account To view email
Published 08/05/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.