ID 539517

Archived

Park Street Sidewalk & Lehigh Circle Reconstruction Project, Metaline Falls WA

Pend Oreille County

Bid Date: 06/09/2020 at 11:00am

Pend Oreille Boulevard from Park Street to B S Avenue includes 2.5” HMA overlay with roadway excavation in areas of subgrade failure and a gravel shoulder. Lehigh Circle from Highway 31 to 215 feet northeast includes full reconstruction with a new base, paving, grading, and a drainage swale with dry well. Park Street sidewalk in front of Selkirk Elementary School includes removing the existing 10’ wide sidewalk, excavation of unsuitable fill material, a new ADA compliant sidewalk, new ADA ramps on existing sidewalks, replacing a concrete inlet, and pavement patches.

Town of Metaline Falls, WA

Marissa Siemens, Thomas Dean & Hoskins Engineering
 (509) 622-2888

Published 05/16/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.