ID 583105

Archived

Prescott, Cottage and Allston St Improvements, Medford, MA

Middlesex County

Owner Reference: 21-0093

Bid Date: 05/12/2021 at 01:00pm

Estimate: $1,500,000

The work includes, but is not limited to: Pavement rehabilitation including micro milling and overlay including sections of pavement reclamation, installation of intermediate, leveling and surface course superpave material, water main replacement, installation of new granite curb; removal and resetting of granite curb, structure adjustments as required, removal and replacement of cement concrete sidewalk, installation of cement concrete wheelchair ramps, installation of pavement markings and traffic signing, safety controls and signing for construction operations, and all other incidental items included in the contract documents. The project also consists of furnishing all labor, tools, materials and equipment necessary for the removal and replacement of various size water mains and appurtenances including gate valves, valve boxes, hydrants, services and temporary bypass piping; and for all trench pavements. The length of water main improvements amounts to approximately 1,200 linear feet of replacement of 6-inch with new 8-inch ductile iron water main and appurtenances. The location of the water main replacement is located on Allston Street and Cottage Street. Deadline for questions is May 5, 2021 by 1:00pm. Bonds and prevailing wages

City of Medford, MA

Fiona Maxwell
 (781) 393-2465
 Login or create an account To view email

Published 04/30/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.