ID 540466

Archived

RCTC-SR-91 Corridor Operations Project Riverside,Ca

Riverside County

Owner Reference: IFB No. 20-31-069-00

Bid Date: 07/02/2020 at 02:00pm

Pre-Bid: 05/28/2020
https://global.gotomeeting.com/join/648499717 or 669-224-3412 access code: 648-499-717

Construction of the State Route 91 Corridor Operations Project. The Project involves Construction Services to add one additional lane to the westbound State Route 91 between Green River Road on-ramp and the southbound State Route 241 toll road connector in the cities of Corona, Yorba Linda and Anaheim Hills. This project is hereby referred to as the Corridor Operations Project. The project scope generally consists of the addition of one general purpose (GP) lane approximately 2 miles in length in the WB direction on SR-91 from Green River Road to SR-241. This involves adding approximately 9 to 10 feet of outside widening to SR-91 at some locations and restriping in others. Additional work includes widening the County Line Creek UC, constructing new retaining walls approximately 3,200 feet in length and approximately 6 to 28 feet in height on the north side of SR-91, reconstructing a portion of Green River Road, and replacing overhead signs. DBE goals.Q&A due by 06/11/20 at 2PM. Bonds required. Prevailing wages.

Riverside County Transportation Commission (RCTC), CA

Jose Mendoza
 (000) 000-0000
 Login or create an account To view email

Published 05/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.