ID 646494

Archived

Redondo Boat Ramp South Float Replacement, Des Moines, WA

King County

Bid Date: 11/29/2022 at 11:00am

Trades: General Engineering Contractor GEC; Subcontractor Opportunities

The City of Des Moines Marina is replacing the south boarding float string at the Redondo Beach Boat Launching Ramp and is seeking a contractor to build the six (6) 5 ft. X 18 ft. and three (3) 5 ft. X 24 ft. float units that, when connected together, will make up the 5 ft. X 180 ft. boarding float system on the south side of the launching ramp. The individual float units are to be constructed as shown and described in the plans and specifications posted in the City’s on-line plan room. The completed float units are to be delivered to the City of Des Moines Marina. Bonds required.

City of Des Moines WA

Scott Wilkins
 206-824-5700
 Login or create an account To view email

Published 11/08/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.