ID 560318

Archived

Restoration & Hazard Mitigation of the Briscoe Pumping Plant, Fort Bend Co., TX

Fort Bend County

Owner Reference: 27.11.04

Bid Date: 11/04/2020 at 02:00pm

Pre-Bid: 10/21/2020
Briscoe Pumping Plant

Gulf Coast Water Authority is looking to repair damages from Hurricane Harvey. This project is obligated through TDEM and is FEMA funded. The Briscoe Pumping Plant consists of three water intake pumps. Restoration and hazard mitigation will occur along Steep Bank Creek and Brazos River. Restoration and hazard mitigation of Steep Bank Creek will consist of grading and a rip rap protection design. Restoration and hazard mitigation along Brazos River will consist of replacement of river training structures (Palisades) combined with rip rap armoring. Alternate contact: Adam Faschan (afaschan@ardurra.com).Bonds required. Prevailing wages apply.

Gulf Coast Water Authority

James Urmin (Ext 23)
 (713) 460-4601
 Login or create an account To view email

Published 10/12/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.