ID 670314

Archived

Resurface, ADA Improvements, Add Lanes & Modify Signals, Greene, Dallas Counties, MO

Greene County

Owner Reference: 230616-G01 / FAF 744-1(16),17,18,19,20,22

Bid Date: 06/16/2023 at 11:00am

Estimate: $7.5M to $10M

Trades: Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, Cementations Coating Systems, Resurfacing & Seal Coat or Sealings, Concrete Contractor: CIP Concrete, Pedestrian Improvements, Sidewalks, Curbs Gutters, Driveways & Handicap ADA Ramps NIGP 913-47, Traffic Signals, Control & Monitoring - Electrical & General Engineering Contractor, General Engineering Contractor GEC; Subcontractor Opportunities

Proposed work: Job J8P3050C Route 744 Greene County. Resurface on Kearney Street from Rte. 13 (Kansas Expressway) to Loop 44 (Glenstone Avenue), the total length of improvement being 2.64 miles. (2): Job J8S3149 Route 744 Greene County. ADA improvements on Kearney Street at various locations between Rte. 13 (Kansas Expressway) and Loop 44 (Glenstone Avenue) in Springfield, the total length of improvement being 2.709 miles. (3): Job J8S3162 Route 744 Greene County. Resurface on Rte. 744 (Kearney Street) from east of Loop 44 (Glenstone Avenue) to Mulroy Road, and on Mulroy Road from Rte. OO to I-44, the total length of improvement being 4.416 miles. (4): Job J8S3169 Route 744 Greene County. Resurface on Rte.744 (Kearney Street) from Springfield Airport to west of Rte. 13 (Kansas Expressway), the total length of improvement being 3.463 miles. (5): Job J8S3172 Route 744 Greene County. ADA improvements at various locations on Kearney Street from east of Loop 44 (Glenstone Avenue) to LeCompte Road, the total length of improvement being 1.942 miles. (6): Job J8S3190 Route 744 Greene County. ADA improvements on Kearney Street from Rte. 160 (West Bypass) to Rte. 13 (Kansas Expressway) in Springfield, the total length of improvement being 1.826 miles. (7): Job JSR0127 Route 65 Dallas County. ADA improvements from Route 32 to 0.1 mile south of Truman Road in Buffalo, the total length of improvement being 0.888 miles. (8): Job JSU0085 Route 744 Greene County. Add lanes and modify signals on Kearney Street from Springfield-Branson National Airport to LeCompte Avenue, the total length of improvement being 7.267 miles. Contract Time: 12/1/25. DBE goal 6%. Bonds required. Prevailing wages.

State of Missouri Department of Transportation (MODOT) MO

Bid Questions
 573-751-9253
 Login or create an account To view email

Published 05/12/2023 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.