ID 604677
Archived
Allen County
Bid Date: 11/08/2021 at 10:30am
Pre-Bid: 10/28/2021
virtual Pre-Bid Conference; contact Jacob Mix for details
Estimate: $1,236,700
The Project includes the furnishing and installation of all labor, equipment, materials, appurtenances, and
incidentals required for the design, fabrication, erection, and disinfection of one elevated water storage tank
and approximately 950 lineal feet of 12-inch waterline. It also includes, but is not limited to, the foundation
design, excavation and backfill, site work and access drive, valves and waterline accessories, chlorine booster
system, tank mixing system, SCADA including instrumentation and communication system, chlorine booster
system, electrical work, and painting.
County of Allen Commissioners OH
Jacob Mix
614-493- 3401
Login or create an account To view email
Published 10/19/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.