ID 614334

Archived

Saratoga Greenbelt Downtown Connector, Saratoga Springs, NY

Saratoga County

Owner Reference: RFP #2022-01, D035900, PIN 1760.86

Bid Date: 02/04/2022 at 02:00pm

Trades: General Engineering Contractor GEC

The project will provide a 1.6-mile trail that begins at the intersection of Lake Avenue/High Rock Avenue and ends at the existing trail terminus on Excelsior Avenue. The project will construct a 10-foot-wide multi-use path on the north side of the roadways. It will also reconstruct the High Rock Avenue/Excelsior Avenue/Warren Street intersection so that both Warren Street and the High Rock Avenue spur intersection the mainline at ninety-degree angles and are stop controlled. The mainline will operate under a free-flow condition. As a result of the trail/intersection construction there will be improvements to storm drainage, the Excelsior Avenue/East Avenue signal, roadway striping and landscaping. The project will also construct segments of sidewalk to connect the existing network located primarily on the south side of the roadways. Miscellaneous appearances such as benches, wayfinding signage, bike racks will be installed to support the trail. DBE goal is 7%. 

Bonds required. Prevailing wages.

City of Saratoga Springs, NY

Stefanie Richards
 (518) 587-3550
 (518) 587-6512
 Login or create an account To view email

Published 01/14/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.