ID 629547
Archived
King County
Owner Reference: 2020-072
Bid Date: 06/15/2022 at 02:00pm
Pre-Bid: 05/24/2022
through WebEx. The City plans to video record this meeting and post it on this project site on procureware following the meeting.
Estimate: $8.4M
Trades: Sanitation System, Sewer Connection, Septic Tank Contractor, On Site Sewage Facility (OSSF); Culverts, CIPP liners, Tank Power W, General Engineering Contractor GEC
10% MBE and 6% WBE goals. Project is located in the Wallingford neighborhood of Seattle along N 35th St from Stone Way N to Interlake Ave N, and along Stone Way N from N 34th St to N 35th St. Work consists of combined sewer pipe, maintenance holes, a combined sewer diversion structure, water main, roadway, associated demolition, contaminated soil removal, dewatering system, electrical and instrumentation, and landscaping. Bonds required. Prevailing wages.
City of Seattle WA
Ryan Brady
(206) 684-3617
Login or create an account To view email
Published 05/21/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.