ID 625645

Archived

Sewer & AC Water Group 765A, San Diego, CA

San Diego County

Owner Reference: K-22-2082-DBB-3

Bid Date: 06/07/2022 at 02:00pm

Estimate: $16,300,000.00

Trades: A - General Engineering Contractor GEC, C34 - Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Camera CCTV Inspections, C42 - Sanitation System, Sewer Connection, Septic Tank Contractor, On Site Sewage Facility (OSSF); Culverts, CIPP liners, Tank Power W

Construction of Sewer & AC Water Group 765A consists of the installation of approximately 18,382 linear feet (3.48 miles) of 8-inch and 10-inch sewer mains to replace existing 8-inch sewer mains, 1,136 linear feet (0.22 miles) of 8-inch VC sewer main rehabilitation, and installation of approximately 18,077 linear feet (3.42 miles) of 8" water mains to replace existing 4-inch, 6-inch, 8-inch, and 10-inch water mains. Related work includes sewer replumbing, sewer and water abandonment and realignment, water pump station abandonment, water service and sewer lateral replacement, sewer lateral rehabilitation, curb ramp installation, potholing, fire hydrant installation, street resurfacing, traffic control, and construction management practices (BMPs). Project duration is 687 working days. Subcontracting participation percentages apply to this contract. 1. SLBE participation 8.7% 2. ELBE participation 13.6% 3. Total mandatory participation 22.3% Bonds required. Prevailing wages.

City of San Diego CA

Ronald McMinn
 (619) 533-4618
 Login or create an account To view email

Published 04/16/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.