ID 627431

Archived

Sewer Pipeline Rehabilitation, Palm Desert & Thousand Palms, CA

Riverside County

Owner Reference: 2021-17

Bid Date: 06/07/2022 at 02:00pm

Pre-Bid: 05/18/2022
Teams Meeting. https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_YTQ5NGNkZDUtYTQyMS00MzlkLTliYjUtYzk0Y2IyNjAyNzBh%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522c096dce7-4f00-4ac7-a62c-bb82d18e4bc3%2522%252c%2522Oid%2522%253a%2522fd312272-b18a-4f0f-9c38-2854000658d3%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=c9065677-5d61-46d2-b1f6-1d

Trades: A - General Engineering Contractor GEC

Furnish and install 1,810 linear feet of 12-inch diameter cured in place pipe (CIPP). Furnish and install 2,000 linear feet of 6-inch diameter CIPP. Furnish and install 210 linear feet of 8-inch diameter CIPP. Reinstate 29 sewer lateral connections (“top hats”). Furnish and install 405 linear feet of 10-inch diameter CIPP. Furnish and install 2 composite manhole covers. Provide video inspection and cleaning before and after CIPP installation. Furnish, install and maintain traffic control, bypassing, testing samples of installed CIPP. Questions are due by 2:00 PM on May 25th. Project duration is 180 days. Bonds required. Prevailing wages.

Coachella Valley Water District CA

Diego Colorado
 760-398-2651
 Login or create an account To view email

Published 05/02/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.