ID 636245
Archived
Douglas County
Owner Reference: R-5897A
Bid Date: 08/18/2022 at 02:00pm
Pre-Bid: 08/10/2022
Teams Meeting: https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDY2OTE5MDYtZjEzNS00YzM2LWE2YzYtNDVhYjRiZjAxZWNj%40thread.v2/0?context=%7b%22Tid%22%3a%229cf07bc1-6fa2-4d49-bc93-7acced6cc8d7%22%2c%22Oid%22%3a%2241c2541f-5743-487e-8543-7c4178a22eb4%22%7d
Trades: Solar Photovoltaic (PV) Contractor, CO-21 - General Contractor GC, CO-01 - General Engineering Contractor GEC
The Spinney Tap Facility is a remote flow control facility located near the Spinney Mountain Reservoir and operated by the City of Aurora Water Department. The Spinney Tap infrastructure is designed to automatically control water flow rates to several downstream municipalities The Spinney Tap facility is not served by any electric utility, with the totality of its usage requirements currently served by an antiquated solar photovoltaics and battery storage system, and a backup propane generator for when the PV + batteries cannot meet the load. Questions due 8/12/22. New construction. Bonds required. Prevailing wages.
City Of Aurora CO
Nathan Jones
(303) 739-7343
Login or create an account To view email
Published 08/03/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.