ID 632764

Archived

Steptoe St. & Gage Blvd. Intersection Improvements, Kennewick, WA

Benton County

Owner Reference: P2012-22

Bid Date: 07/13/2022 at 10:00am

Estimate: $2.3M - $2.6M

Trades: General Engineering Contractor GEC

DBE COA goal 15%. This Contract provides for the improvement of Steptoe St. and Gage Blvd Intersection: Improvements consist of providing dual left turn lanes on each approach as well as new dedicated right turn lanes on the southbound and eastbound legs of the intersection. City of Richland and City of Kennewick water inter tie meter and valves will be relocated at the southwest corner of the intersection. Traffic curbing and a raised concrete island will be installed to restrict access to driveways within the functional area of the intersection. The existing traffic signal will be replaced with a new traffic signal system. Majority of signal components including poles, mast arms, heads and control cabinet have been pre-purchased and stockpiled at the City shops. Traffic signal timing will be optimized with this configuration along with the elimination of split phase timing. This project includes installation of curb, gutter, sidewalk and retaining walls. There will be some storm drainage catch basin relocations and utility adjustments. The entire intersection will be overlaid with hot mix asphalt and restriped. Most of the landscaping will be completed by the property owner and some trees will be replaced at specific locations as part of this project, and other work Bonds required. Prevailing wages.

City of Kennewick WA

Heath Mellotte
 (509) 585-4287

Published 06/23/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.