ID 581274

Archived

Traffic Signal Modifications At Warner/Graham, Warner/Nichols & Brookhurst/Indianapolis, Huntington Beach, CA

Los Angeles County

Owner Reference: CC-1548,1550,1625

Bid Date: 04/20/2021 at 02:00PM

Estimate: $430,000

This project consists primarily of modifying three traffic signals including the installation of new poles, signal heads, detector loops and other traffic signal equipment. The project also includes the installation of conduit, pull boxes and electrical conductors. Curb, curb ramp, asphalt and sidewalk construction is also a component. Bonds required. Prevailing wages

City of Huntington Beach, Public Works, CA

William Janusz
 (714) 536-5431
 (714) 374-1573
 Login or create an account To view email

Published 04/07/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.